We start from your business, not from a template.

Four stages, each with a deliverable and a gate to move on. The first one measures the before. The last one measures the after.

  1. Measure the before
  2. Design
  3. Build to measure
  4. Measure the after

The four stages

From a measured before to a measured after.

Every stage ends with a deliverable and a gate. We only move on when the decision maker approves the gate.

  1. Stage 01Measure the before

    Measure before designing.

    We measure the starting point and learn the problem inside your operation. The design starts from scratch, from your business.

    What we do

    • A measured diagnosis of site, systems, data and funnel
    • Talks with the people who use it and the people who decide
    • A result letter, written before any code
    You get
    Measured baseline and the result letter
    Typical timeline
    1 to 2 weeks
    Gate to move on
    Baseline measured and problem approved by the decision maker.
  2. Stage 02Design

    The hard part, proven first.

    We decide what goes in and in what order, and prove the hard part in a prototype before building the rest.

    What we do

    • A roadmap in cycles, with one metric and one owner per front
    • A clickable prototype tested with real users
    • 20 to 50 real cases with the right answer to evaluate the AI
    You get
    Roadmap, prototype and AI evaluation cases
    Typical timeline
    2 to 3 weeks
    Gate to move on
    Prototype approved and every risk answered.
  3. Stage 03Build to measure

    You watch the product move.

    Short cycles with a demo at the end of each one, and a monitored launch with a guaranteed rollback and engineering beside you.

    What we do

    • A review on every change and automated end-to-end tests
    • Speed, accessibility and security checked on every delivery
    • Daily backup with tested restores, and a trained team
    You get
    Software live, monitored, and the team trained
    Typical timeline
    cycles of up to 6 weeks
    Gate to move on
    Quality gate and readiness review passed.
  4. Stage 04Measure the after

    The after, with the same method.

    The same measurement as the start, 30 days after launch. The next cycle is decided with a number.

    What we do

    • The baseline measurement, repeated
    • Actual return against the estimate
    • AI evaluated in production on every change
    You get
    The Δ measured, with source and date
    Typical timeline
    30 days after launch
    Gate to move on
    Result measured and presented to the decision maker.

Typical timelines. Your project’s timeline comes out of the diagnosis and goes into the proposal.

AI in production

Why our AI makes it past the pilot.

Five rules apply to every agent we ship.

  1. One flow, one metric, one owner

    One process, one number that matters and one person responsible for it.

  2. Real cases before code

    Without cases that have the right answer, the agent does not start.

  3. A person at the decision point

    The agent prepares and suggests. Where there is risk, a person approves.

  4. Cost per task measured

    You know what each conversation costs.

  5. Tested on every change

    New model or new instructions? The cases run again before release.

Human support

One person beside you, from first contact to after launch.

No tickets, no queue. Whoever answers knows your system.

  • One person you know

    The same name from start to finish, on a direct channel.

  • Something working at every step

    You watch the product grow, not a status report.

  • Response times in the contract

    Each level of severity has its own written deadline.

  • Backup and monitoring

    An alert when something goes down, before your customers notice.